ODEC is prioritizing use of the existing transmission corridor. Preliminary engineering indicates that a potential path exists for both transmission lines to enter the Tasley Substation within the same right-of-way.
However, the project is still in engineering development. ODEC will contact affected landowners directly before beginning work that may affect their property.